THE INFLUENCE OF SUPPORT AND INFORMATION SYSTEM TOWARD THE USE OF WORK INFORMATION IN BUDGETING WITH DEVELOPMENT FACTOR AS INTERVENING VARIABLE
PDF

Keywords

Political and Technical Factors
Information System Capability
Incapability of Explaining and Evaluating Performance Metrics
Performance Measurement Development
Performance Information Utilization

How to Cite

Diptyana, P., & Basuki, H. (2010). THE INFLUENCE OF SUPPORT AND INFORMATION SYSTEM TOWARD THE USE OF WORK INFORMATION IN BUDGETING WITH DEVELOPMENT FACTOR AS INTERVENING VARIABLE. Journal of Economics, Business, and Accountancy Ventura, 13(1), 39-58. https://doi.org/10.14414/jebav.v13i1.419

How to Cite

Diptyana, P., & Basuki, H. (2010). THE INFLUENCE OF SUPPORT AND INFORMATION SYSTEM TOWARD THE USE OF WORK INFORMATION IN BUDGETING WITH DEVELOPMENT FACTOR AS INTERVENING VARIABLE. Journal of Economics, Business, and Accountancy Ventura, 13(1), 39-58. https://doi.org/10.14414/jebav.v13i1.419

Abstract

This research is dealt with political factors using internal and external organization supports as proxy. Besides that, it also uses information system as variables that influence work performance measurement development as well as the utilization of performance information in budgeting. This research attempts to test and confirm whether such factors are consistently influential toward work performance measurement development and utilization of performance information in budgeting as conducted by the previous studies. It uses random sampling system,
consisting of 316 executives with the echelon ranks of 2, 3, and 4 at the regional government offices, Jogjakarta, Indonesia. This research reveals that political factor influence utilization of performance information in budgeting, both directly and indirectly through performance measurement development. In addition, information system capability, incapability
of explaining and assessing performance metrics (as technical factors) do not influence either directly or indirectly both work performance measurement development and utilization of performance information in budgeting. Yet, another technical factor, which is technical knowledge, has significant influence toward work performance measurement development in budgeting. These findings imply that the change into performance measurement-based budgeting is influenced by the regional government’s internal and external support, external participations such as society for escorting the regional government officials in facing the budgeting system change.

PDF
Creative Commons License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.